Every Cooling Solution We Have it ...
Our Project





HVAC package for Telecom/Instrument & Electrical Building for PLATFORM SUP
PROJECT : TUNU PHASE 11 EPSC 5 SUP
Locate East Borneo Samarinda Indonesia





HVAC system for Telecom/Instrument & Electrical Building
PROJECT : NCP Locate East Borneo Indonesia





Project Locate : on PECIKO 6 East Borneo Indonesia
Airfreight cost for : Fire Damper - HVAC Equipment
Commissioning Spare Part for HVAC (PCK6-P-2.1)
HVAC Training (PCK6-C)
HVAC Commissioning Assistance Eng for PCK 6 Project
Test Bench of Inergen Pressure Relief Dampers for PCK 6 Project
2nd HVAC Training (PCK6-C)





HVAC Package for CPOC B17 Development Muda Production Platform (MDPP)
PROJECT : CPOC Locate SONGKLHA Thailand


Supply, Fabrication, Installation, Transportation, Testing and Commissioning for the HVAC
Systems for LER, Switch Room, Battery Room and LAB room.
PROJECT : JDA Block B-17 Development Project Muda Production Platform (MDDP) for CPOC Project (SMOE Job Ref : MPG001)
Location : Singapore


Airfreight for Tunu Field Development Project Phase 11S EPSC 5
Systems for LER, Switch Room, Battery Room and LAB room.
Location : East Borneo , Indonesia

Installation of HVAC unit
Systems for LER, Switch Room, Battery Room and LAB room.
PROJECT : SUP Sungai Purun Samarinda
including Material Breakdown, Tools for installation, Man Power,Transport,Mobilisation and Demobilisation
Location : East Borneo , Indonesia
Package Air Conditioning System
PROJECT : Building 1 Unit Oil Tanker
Location : Tanjung Priok , Indonesia
Including 2 Unit Ac Carrier Marine Packaged (Model YFD 127)
Tug Boat Pelindo III 2x1500 HP 120=1unit
Tug Boat Pelindo III 2x1500 HP 121=1unit
Location : Tanjung Priok , Indonesia
1 Lot Material for repairing Ac System KMP Nakroma
1 Lot Chiller Working Unit(Overhaul Kompresor dan Circilation Pomp) and Pipes Chilled Water Installation
Location : Tanjung Priok , Indonesia